This is the truck approach into the village (Lot I) from Lot G. Trucks will enter through one of four sliding east fence gates and exit out the southwest vehicle gate into Lot A, which is the large parking lot south of the village. Note that the truss arches will be in place at the start of assembly because they are required for construction power. However, the medians and info desk will be set up several days into the assembly phase after all cranes and large vehicles are gone.


All four truss arches have identical dimensions. They have 15 feet of vertical clearance, which should be more than enough for all unpermitted loads.